Hughes Aircraft Industrial Complex

  • Industrial Structures

Xypex was applied to foundation walls on this project. The original specifications called for an elastomeric membrane, but this was replaced by Xypex because of the shorter backfill time required and there was to necessity to rub or smooth out the walls. An added benefit was that no protection board was needed.