Palo Alto Wastewater Treatment Plant

  • Concentrate
  • Patch’n Plug
  • Wastewater Collection & Treatment

Xypex Patch’n Plug was used to repair the cracks on the roof of the digester tank. Xypex Concentrate was then applied over all areas.